Jetse
Wednesday, April 4, 2012
Urban Infill Project
I decided to scrap my entire layout after a great discussion with my group and my instructor. My idea weren't bad, they just weren't an appropriate response to the site. I intent to have 4 floors supported in 4 places One of those 4 places will be the elevator shaft.
Wednesday, March 7, 2012
Rice Research Facility Boards
Monday, February 13, 2012
2nd "Unofficial" Pin-Up
Today we presented our progress so far with an emphasis on structural systems/details.
This drawing was done using a combination of SketchUp, AutoCAD, Illustrator, and hand drawing techniques. As happy as I am, and believe me I love it, this drawing looks it took over 3 hours to do and so I will likely do my project in Revit to allow myself to have all the necessary views. (Thank you Teddy for showing me a much needed AutoCAD command allowing me to keep a large majority of this drawing in vector form)
Friday, February 3, 2012
Our "Unofficial" Pin-Up
Tuesday, January 24, 2012
My Entrance
My entrance had been bothering me and although it was recommended for me to work on floor plans, I couldn't help myself. I had to define my entrance way in a better way before I could allow myself to work on the floor plans. I will end up redesigning my stairs elevator soon as well.
Subscribe to:
Posts (Atom)